Insufficient coverage
No critical or high issue was observed, but coverage was not sufficient to certify this surface as safe. A findings-free result here reads as insufficient coverage, not safe.
Why these stay. The verdict is coverage aware. A clean result would read "Insufficient coverage", not "Safe", precisely because these rules did not run. Hiding them would let a shallow scan look as thorough as a deep one.
How this server was scanned
The method behind this result was not recorded: the scan predates it. How deep it reached is unknown, and is not implied by anything on this page.
Verifiable Findings
Not yet attestedThis server has not been scanned with attestation enabled yet.
How to verify this yourself
# Re-run the analyzer on the signed snapshot and recompute the findings digest curl -s https://mcp-sentinelapi-production.up.railway.app/api/v1/servers/watt-street-us-grid-interconnection-queue-and-data-center-power/attestation.json > att.json npx mcp-sentinel verify-scan --attestation att.json # Prove the attestation is in the public transparency log curl -s https://mcp-sentinelapi-production.up.railway.app/api/v1/servers/watt-street-us-grid-interconnection-queue-and-data-center-power/attestation/inclusion.json > incl.json npx mcp-sentinel transparency verify-inclusion --proof incl.json
Observed behaviorexecuted in sandbox
Declared tool hints vs. what each tool was actually observed to do when executed in our egress-denied sandbox - plus any witnessed tool→tool flow within this one server. This is not cross-server toxic flow, which composes several servers in one config.
No observed-behavior record is on file for this server's latest scan.
This is a coverage gap - we did not execute this server’s tools in the sandbox for this scan. It is not a clean result and is not scored as one. To see how observed behavior is rendered when a run does happen, view the illustrative cross-server toxic flow.
Intrinsic here, config-scoped elsewheredual unit
Everything on this page — the verdict, every finding — is Watt Street — US grid, interconnection queue and data center power assessed on its own. That is its intrinsic posture. Whether it becomes one leg of a cross-server toxic flow is a different, config-scoped question: it depends on which other servers share its client config, and no verdict on this page changes for it.
Deepen this scan
Every link below opens a form prefilled with this server’s details. Nothing runs until you submit.
- Combine with other serversanalyze this server alongside others in one config
- Watch it run in a sandboxobserve the published artifact under an egress-denied sandbox